Your Cart is Empty 
Home PageContactSupportAbout Us   
Product Search
Software  WorkshopsCertificationBooks

IC³ Workshops
Workshop Outline
Site Requirements
Getting Reimbursed
How to Prepare
IC³ Workshop Schedule
Registration Form
Additional Information


In Demand Training Solutions is a Certiport Authorized Academic and Commercial Distributor

 


IC³ Workshops

Site Requirements

Lab site requirements for hosting a workshop:

Minimum of 20 attendees.
Specific Workstation Requirements:

NOTE: TWO LABS ARE REQUIRED

 
Lab One: Training Computers
Lab Two: Testing Computers
Number of Computers
1 per workshop attendee 4 for every 5 workshop attendees
CPU
Pentium 166 MHz Pentium 166 MHz
RAM
32 MB 32 MB
Hard Drive
100 MB available

100 MB available

Printer
Required (can be a network printer) Required (can be a network printer)
Internet Connection
  Permanent connection: T-1, DSL or Cable. Win Modems, dial-up, and AOL are NOT supported.
Operating System
Windows 95/98/NT/2000/XP Windows 98 (SE)
Windows 2000 Professional (SR3)
Windows XP Professional (SP1)
Software

 

Internet Explorer 5.5 or higher

Disable all anti-virus software

Security/
Firewalls

Security programs--such as WinShield and FoolProof, must be disabled or set such that users can create folders and save files on the local hard drive.

Security programs--such as WinShield, FoolProof, and Fortress--must be disabled or set such that users can create folders and save files on the local hard drive.

If your installation uses a proxy server, the proxy server information must be set up in the Internet Options, Connections, LAN Settings, Proxy Settings dialog box.

Firewalls must permit full access to https://iqcenter.certiport.com via Synchronizer, a Certiport Inc. program that connects directly to the URL (not through a browser) using ports 80 and 443. If you have a contract with an ISP or other provider who manages the firewall, you must arrange with the contractor to allow access in and out through the firewall.

Most of the workshop will be spent at the training computers. We will install In Demand Test Prep software on each of these computers for the workshop. There needs to be one training computer for every workshop attendee.

We will install the IC³ Test software on the testing computers. The testing computers should be separated from the training computers, since the training area can be rather noisy and the testing area should be quiet. This also should provide for more confidentiality of the IC³ test scores when they are printed. There needs to be approximately four testing computers for every five workshop attendees.

 

All content ©2010 In Demand Training Solutions.
Click here to read our sales policies.